Building Survey & Feasibility Study
Feasibility studies are preliminary studies undertaken in the very early stage of a project. The purpose of Feasibility study is to collect the required input details from the client to do our load calculations.
Concept Design Submittal
We will prepare and submit a report of findings with options considered, evaluation criteria, and recommendations. And we will submit Design basis report will contain all load calculation report, System selections, Advantage of proposed system, Energy saving though innovative design, implementation of new technologies, Energy analysis & cost analysis.
Budgetary Proposal
Approximate budget estimation of proposed project which helps client to make their project budget.
Detail Design Development
Detail design document will contain final design basis report and final design drawings as follows:
Heating and Cooling Load Calculations
Performing heating and cooling load calculations for all conditioned building spaces to determine the zones and capacity of the new heating, ventilation, and air conditioning. Calculations will be based on: conduction and convection heat transmission, air ventilation and infiltration, solar heat gain, maximum anticipated staff and public occupancy, existing and future equipment, machines, appliances, and other internal building heat sources. Identify and locate all of the equipment, machines, appliances, and other similar internal building heat sources on the floor plans of the building. Include their BTU ratings so they can be used for the heating and cooling load calculations and future air conditioning system balancing.
HVAC Systems selections
The HVAC Design will comply with all applicable codes and provide a design for the air conditioning, ventilation, and controls, considering efficiencies, life cycle operating and maintenance costs, energy rebates and/or grants, costs and schedules, etc. Includes all equipment’s schedules on the drawings indicating the air conditioning equipment’s by symbol designation, name and estimated size or capacity in TR/BTU, GPM, gallons, etc. Include ventilation schedules for all building spaces. Indicate the location of all air conditioning equipment, all major piping, and all duct runs in the mechanical room and floors of the building.
Duct layout
The layout will be designed in such a way for maximum air distribution. We will provide a design which includes plenums, ductwork, blowers, registers, grills, diffusers, dampers, volume adjustment devices, controls, etc. And will provide for proper outside air ventilation and air change quantities for the building.
- Air Conditioning for Offices, Buildings
- Air Conditioning for Hospitals, OT, Laboratories etc.
- Air Conditioning for Malls, Hotels, Restaurants etc.
- Air Conditioning for Retail Stores, Supermarkets etc.